High End Condominium
Fenway Area Boston
Before Image
After Image
Project Name:
Leak Repair
Leak Repair
Project Description
This unit suffered a large pipe break that left the floor, carpeting, walls, ceilings, and subfloor completed rotted out. Our crews stopped the leak, ripped out all of the damaged material, performed mold remediation, and then completely rebuilt the affected area. A tenant was living here at the time, so these repairs had to done in an extremely time sensitive manner and with a respect for the tenants belongings.
This unit suffered a large pipe break that left the floor, carpeting, walls, ceilings, and subfloor completed rotted out. Our crews stopped the leak, ripped out all of the damaged material, performed mold remediation, and then completely rebuilt the affected area. A tenant was living here at the time, so these repairs had to done in an extremely time sensitive manner and with a respect for the tenants belongings.